Please note - Prior to decision or at appeal stage a full list of public comments for this application are available on the comments tab on the main application details page.

Associated Documents

Drawings can be large files. The quality of the image depends on the quality of the original submission.

Date publishedDocument TypeDrawing NumberViewDescription
24 Jun 2008Application Form Whole DocAPPLICATION FORM
24 Sep 2008Drawing Whole DocAIR CONDITIONING
24 Jun 2008Drawing1407/56Whole DocBASEMENT PLAN AS EXISTING
24 Jun 2008Drawing1407/60Whole DocBLOCK PLAN
24 Jun 2008Drawing1407/26Whole DocDETAILS OF EAST TERRACE
24 Jun 2008Drawing1407/27Whole DocDETAILS OF MAIN ENTRANCE STEPS
24 Jun 2008Drawing1407/28Whole DocDETAILS OF WEST TERRACE AND WEST ENTRANCE STEPS
24 Jun 2008Drawing1407/25Whole DocDETAILS OF WHEEL CHAIR LIFT AND EAST ENTRANCE STEPS
24 Jun 2008Drawing1407/53Whole DocEAST ELEVATION AS EXISTING
24 Jun 2008Drawing1407/31Whole DocENTRANCE LOBBY DETAILS
24 Jun 2008Drawing1407/51Whole DocFRONT ELEVATION AS EXISTING
24 Jun 2008Drawing1407/50Whole DocFRONT ELEVATION IN STREET CONTEXT AS EXISTING
24 Jun 2008Drawing1407/32Whole DocFULL SIZED ENTRANCE LOBBY DETAILS
24 Jun 2008Drawing1407/55Whole DocGROUND FLOOR PLAN AS EXISTING
24 Jun 2008DrawingS100-121Whole DocKITCHEN LAYOUT
24 Jun 2008Drawing1407/29Whole DocLOWERED WINDOW CILL DETAILS
24 Jun 2008Drawing1407/30Whole DocMAIN ENTRANCE DOOR DETAILS
24 Jun 2008Drawing1407/33Whole DocMEZZANINE BALUSTRADE DETAILS
24 Jun 2008Drawing1407/34Whole DocMEZZANINE STAIRCASE 3 DETAILS
03 Sep 2008Drawing1407/18AWhole DocPROPOSED BASEMENT PLAN
24 Jun 2008Drawing1407/14Whole DocPROPOSED EAST ELEVATION
24 Jun 2008Drawing1407/12Whole DocPROPOSED FRONT ELEVATION
03 Sep 2008Drawing1407/12AWhole DocPROPOSED FRONT ELEVATION
24 Jun 2008Drawing1407/11Whole DocPROPOSED FRONT ELEVATION IN STREET CONTEXT
24 Jun 2008Drawing1407/17Whole DocPROPOSED MEZZANINE PLAN
03 Sep 2008Drawing1407/17AWhole DocPROPOSED MEZZANINE PLAN
24 Jun 2008Drawing1407/37Whole DocPROPOSED NEW MANSARD ROOF DETAILS AND KITCHEN EXTRACT CHIMNEY
24 Jun 2008Drawing1407/19Whole DocPROPOSED ROOF PLAN
03 Sep 2008Drawing1407/20AWhole DocPROPOSED SECTION AA
03 Sep 2008Drawing1407/21AWhole DocPROPOSED SECTION BB
03 Sep 2008Drawing1407/22AWhole DocPROPOSED SECTION CC
03 Sep 2008Drawing1407/23AWhole DocPROPOSED SECTION DD
24 Jun 2008Drawing1407/24Whole DocPROPOSED SECTION EE
03 Sep 2008Drawing1407/13AWhole DocPROPOSED SOUTH ELEVATION
24 Jun 2008Drawing1407/15Whole DocPROPOSED WEST ELEVATION
24 Jun 2008Drawing1407/57Whole DocROOF PLAN AS EXISTING
24 Jun 2008Drawing1407/58Whole DocSECTION AA AS EXISTING
24 Jun 2008Drawing1407/59Whole DocSECTION BB AS EXISTING
24 Jun 2008Drawing1407/52Whole DocSOUTH ELEVATION AS EXISTING
24 Jun 2008Drawing1407/35Whole DocSTAIRCASE 1 PLANS
24 Jun 2008Drawing1407/36Whole DocSTAIRCASE 1 SECTIONS
24 Jun 2008Drawing02Whole DocSTRUCTURAL DETAILS GROUND FLOOR
24 Jun 2008Drawing01Whole DocSTRUCTURAL DETAILS LOWER GROUND FLOOR
24 Jun 2008Drawing03Whole DocSTRUCTURAL DETAILS MEZZANINE AND ROOF LEVEL
24 Jun 2008Drawing04Whole DocSTRUCTURAL DETAILS SECTIONS
24 Jun 2008Drawing1407/18Whole DocSUPERSEDED PROPOSED BASEMENT PLAN
24 Jun 2008Drawing1407/16Whole DocSUPERSEDED PROPOSED GROUND FLOOR PLAN
24 Jun 2008Drawing1407/20Whole DocSUPERSEDED PROPOSED SECTION AA
24 Jun 2008Drawing1407/22Whole DocSUPERSEDED PROPOSED SECTION CC
24 Jun 2008Drawing1407/23Whole DocSUPERSEDED PROPOSED SECTION DD
24 Jun 2008Drawing1407/13Whole DocSUPERSEDED PROPOSED SOUTH ELEVATION
01 Jan 1900Drawing7201BWhole DocVENTILATION LAYOUT BASEMENT
24 Jun 2008Drawing702-01BWhole DocVENTILATION LAYOUT BASEMENT
01 Jan 1900Drawing7202BWhole DocVENTILATION LAYOUT GROUND FLOOR
24 Jun 2008Drawing702-02BWhole DocVENTILATION LAYOUT GROUND FLOOR
24 Jun 2008Drawing702-03BWhole DocVENTILATION LAYOUT MEZZANINE
24 Jun 2008Drawing1407/54Whole DocWEST ELEVATION AS EXISTING
24 Jun 2008OS Extract Whole DocLOCATION PLAN
22 Jul 2008Correspondence Whole Doc
01 Jan 1900Correspondence Whole DocAGENT
01 Jan 1900Correspondence Whole DocAGENT
15 Aug 2008Correspondence Whole DocAGENT
05 Sep 2008Correspondence Whole DocAGENT
24 Sep 2008Correspondence Whole DocAGENT
25 Jul 2008Correspondence Whole DocCORRESPONDENCE 25 JUL
03 Sep 2008Correspondence Whole DocEMAIL
12 Sep 2008Decision Whole DocDECISION NOTICE
25 Jul 2008Other Whole DocDRAWING ISSUE SHEET
25 Jul 2008Other Whole DocTOSHIBA AIRCONDITIONING INFORMATION
03 Sep 2008Report Whole DocCOMMITTEE REPORT
09 Sep 2008Report Whole DocUPDATE REPORT
24 Jun 2008BackGround Papers Whole DocDESIGN AND ACCESS STATEMENT
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 1 PAGE 1-23
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 2 PAGE 24-33
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 3 PAGE 34-49
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 4 PAGE 50-62
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 5 PAGE 63-74
24 Jun 2008BackGround Papers Whole DocHISTORIC BUILDING REPORT PART 6 PAGE 75-89
24 Jun 2008BackGround Papers Whole DocISSUE LIST
24 Jun 2008BackGround Papers Whole DocISSUE LIST
24 Jun 2008BackGround Papers Whole DocMARKETING REPORT
24 Jun 2008BackGround Papers Whole DocNOISE ASSESSMENT
24 Jun 2008BackGround Papers Whole DocPLANNING STATEMENT
08 Sep 2008Photo Whole DocCOMPARISON OF EXISTING WITH PROPOSED
24 Jun 2008Photo Whole DocPHOTOGRAPHS
25 Jul 2008Revised Drawing1407/18Whole DocPROPOSED BASEMENT PLAN
25 Jul 2008Revised Drawing1407/16Whole DocPROPOSED GROUND FLOOR PLAN
25 Jul 2008Revised Drawing1407/20Whole DocPROPOSED SECTION AA
25 Jul 2008Revised Drawing1407/21Whole DocPROPOSED SECTION BB
25 Jul 2008Revised Drawing1407/22Whole DocPROPOSED SECTION CC
25 Jul 2008Revised Drawing1407/23Whole DocPROPOSED SECTION DD
25 Jul 2008Revised Drawing1407/13Whole DocPROPOSED SOUTH ELEVATION
30 Jul 2008Consultation Response Whole DocENGLISH HERITAGE
01 Aug 2008Consultation Response Whole DocGEORGIAN GROUP
08 Sep 2008Consultation Response Whole DocGEORGIAN GROUP
08 Sep 2008Consultation Response Whole DocTHE GEORGIAN GROUP