Please note - Prior to decision or at appeal stage a full list of public comments for this application are available on the comments tab on the main application details page.

Associated Documents

Drawings can be large files. The quality of the image depends on the quality of the original submission.

Date publishedDocument TypeDrawing NumberViewDescription
30 Sep 2008Application Form Whole DocAPPLICATION FORM/CERTIFICATE OF OWNERSHIP
23 Oct 2008Drawing0037/602Whole DocBASEMENT PLAN, EXTENSION LINK
30 Sep 2008Drawing1193/106/AWhole DocBIN STORE FENCE
23 Oct 2008Drawing12 200 REV T1Whole DocBLOCKWORK BASEMENT PLAN
30 Sep 2008Drawing1193/300/AWhole DocBORDER PLANTING PLAN
30 Sep 2008Drawing07 110 REV P1Whole DocDEMOLITION BASEMENT PLAN
30 Sep 2008Drawing07 112 REV P1Whole DocDEMOLITION FIRST FLOOR PLAN
30 Sep 2008Drawing07 111 REV P1Whole DocDEMOLITION GROUND FLOOR PLAN
30 Sep 2008Drawing07 113 REV P1Whole DocDEMOLITION SECOND FLOOR PLAN
20 Nov 2008Drawing24 356 T1Whole DocDISABLED TOILET DOOR, GROUND FLOOR
20 Nov 2008Drawing24 302 T1Whole DocDOOR FROM LIFT LOBBY, GROUND FLOOR
30 Sep 2008Drawing24 356 REV T0Whole DocDOORS, DISABLED TOILET DOOR, GROUND FLOOR
30 Sep 2008Drawing24 302 REV T0Whole DocDOORS, DOOR FROM LIFT LOBBY, GROUND FLOOR
30 Sep 2008Drawing24 330 REV T1Whole DocDOORS, DOOR FROM STAIRHALL TO LOBBY, SECOND FLOOR
30 Sep 2008Drawing24 325 REV T1Whole DocDOORS, DOOR TO CURATOR'S OFFICE, FIRST FLOOR
30 Sep 2008Drawing24 326 REV T0Whole DocDOORS, EXISTING CURATOR'S DOOR, FIRST FLOOR
30 Sep 2008Drawing24 311 REV T0Whole DocDOORS, EXISTING DOOR TO GALLERY, SECOND FLOOR
30 Sep 2008Drawing24 313 REV T0Whole DocDOORS, EXISTING GALLERY DOOR, FIRST FLOOR
30 Sep 2008Drawing24 331 REV T1Whole DocDOORS, EXISTING STAIRWELL TO LOBBY DOOR, SECOND FLOOR
30 Sep 2008Drawing24 320 REV T0Whole DocDOORS, GALLERY DOOR, SECOND FLOOR
30 Sep 2008Drawing24 321 REV T0Whole DocDOORS, GALLERY DOORS, FIRST AND SECOND FLOORS
30 Sep 2008Drawing24 327 REV T1Whole DocDOORS, PROPOSED CURATOR'S DOOR, FIRST FLOOR
30 Sep 2008Drawing24 355 REV T0Whole DocDOORS, PROPOSED DISABLED TOILET DOOR, GROUND FLOOR
30 Sep 2008Drawing24 301 REV T0Whole DocDOORS, PROPOSED DOOR SOUTH SIDE, GROUND FLOOR
30 Sep 2008Drawing24 312 REV T0Whole DocDOORS, PROPOSED DOOR TO GALLERY, SECOND FLOOR
30 Sep 2008Drawing24 351 REV T1Whole DocDOORS, PROPOSED FIRE DOOR, BASEMENT FLOOR
30 Sep 2008Drawing24 350 REV T0Whole DocDOORS, PROPOSED FIRE RATED DOOR, BASEMENT FLOOR
30 Sep 2008Drawing24 310 REV T0Whole DocDOORS, PROPOSED GALLERY DOOR, FIRST FLOOR
30 Sep 2008Drawing24 314 REV T0Whole DocDOORS, PROPOSED GALLERY DOOR, FIRST FLOOR
30 Sep 2008Drawing24 315 REV T0Whole DocDOORS, PROPOSED GALLERY DOOR, SECOND FLOOR
30 Sep 2008Drawing24 300 REV T0Whole DocDOORS, PROPOSED MAIN FRONT DOOR, GROUND FLOOR
30 Sep 2008Drawing24 360 REV T0Whole DocDOORS, PROPOSED STAIR LANDING DOOR
30 Sep 2008Drawing24 361 REV T1Whole DocDOORS, PROPOSED STAIR LANDING DOOR
30 Sep 2008Drawing24 332 REV T0Whole DocDOORS, PROPOSED STAIRWELL TO LOBBY, SECOND FLOOR
30 Sep 2008Drawing20 450 REV T0Whole DocDRYLINING & CEILINGS, 2ND FLOOR COFFERED CEILING
30 Sep 2008Drawing20 400 REV T1Whole DocDRYLINING, DRYLINING TYPES
30 Sep 2008Drawing01-200 REV P6Whole DocEXISTING BASEMENT PLAN
30 Sep 2008Drawing06 440 REV T0Whole DocEXISTING BUILDING: DETAILS DG08 PANEL DOORS, EDUCATION LECTURE ROOM GF
20 Nov 2008Drawing24 311 T1Whole DocEXISTING DOOR TO GALLERY, SECOND FLOOR
30 Sep 2008Drawing01-202 REV P5Whole DocEXISTING FIRST FLOOR PLAN
30 Sep 2008Drawing06 SK 05 REV T0Whole DocEXISTING FIRST FLOOR PLAN REPAIRS
20 Nov 2008Drawing24 313 T1Whole DocEXISTING GALLERY DOOR, FIRST FLOOR
30 Sep 2008Drawing01-201 REV P6Whole DocEXISTING GROUND FLOOR PLAN
30 Sep 2008Drawing06 SK 03 REV T0Whole DocEXISTING GROUND FLOOR PLAN REPAIRS
12 Dec 2008DrawingEPA HOL06 SK17 BNES P1Whole DocEXISTING NORTH WEST ELEVATION STONE REPAIRS
30 Sep 2008Drawing02-202 REV P5Whole DocEXISTING NORTHEAST ELEVATION
30 Sep 2008Drawing02-202 REV P4Whole DocEXISTING NORTHEAST ELEVATION
30 Sep 2008Drawing02-201 REV P5Whole DocEXISTING NORTHWEST ELEVATION
12 Dec 2008Drawing06 SK 17 P1Whole DocEXISTING NORTHWEST ELEVATION STONE REPAIRS
30 Sep 2008Drawing01-204 REV P5Whole DocEXISTING ROOF PLAN
30 Sep 2008Drawing01-203 REV P5Whole DocEXISTING SECOND FLOOR PLAN
30 Sep 2008Drawing06 SK 08 REV T0Whole DocEXISTING SECOND FLOOR PLAN REPAIRS
30 Sep 2008Drawing03-200 REV P5Whole DocEXISTING SECTION AA
30 Sep 2008Drawing03-201 REV P5Whole DocEXISTING SECTION BB
30 Sep 2008Drawing03-206 REV P5Whole DocEXISTING SECTION GG
30 Sep 2008Drawing03-207 REV P5Whole DocEXISTING SECTION HH
30 Sep 2008Drawing03-209 REV P5Whole DocEXISTING SECTION KK
30 Sep 2008Drawing00 101 REV P5Whole DocEXISTING SITE PLAN
15 Dec 2008DrawingEPA HOL06 SK18 BNES P1Whole DocEXISTING SOUTH EAST ELEVATION STONE REPAIRS
30 Sep 2008Drawing02-200 REV P5Whole DocEXISTING SOUTH-EAST ELEVATION
30 Sep 2008Drawing02-203 REV P5Whole DocEXISTING SOUTHWEST ELEVATION
12 Dec 2008Drawing06 SK 18 P1Whole DocEXISTING SOUTHWEST ELEVATION STONE REPAIRS
30 Sep 2008Drawing06 450 REV T1Whole DocEXISTING WINDOW AND RADIATOR HOUSING BALLROOM GALLERY, FIRST FLOOR
30 Sep 2008Drawing0488_KSLD_LD201 BWhole DocEXTERIOR SITE PLAN LIGHTING LAYOUT
30 Sep 2008Drawing0488_LD200 BWhole DocEXTERNAL FACADE LIGHTING LAYOUT
30 Sep 2008Drawing06 454 REV T0Whole DocFIRST FLOOR BALLROOM GALLERY WINDOW, PROPOSED SECONDARY GLAZING DETAILS
23 Oct 2008Drawing0037/304 REV CWhole DocFIRST FLOOR PLAN
23 Oct 2008Drawing0037/607Whole DocFIRST FLOOR PLAN, EXISTING BUILDING
30 Sep 2008Drawing21 400 REV T0Whole DocFLOOR FINISHES BASEMENT
23 Oct 2008Drawing21 220 REV T1Whole DocFLOOR FINISHES BASEMENT PLAN
30 Sep 2008Drawing21 420 REV T0Whole DocFLOOR FINISHES FIRST FLOOR
30 Sep 2008Drawing21 411 REV T0Whole DocFLOOR FINISHES GROUND FLOOR - LIFT/LINK LOBBY/KITCHEN
30 Sep 2008Drawing21 410 REV T0Whole DocFLOOR FINISHES GROUND FLOOR SHOP & STAFF ENTRANCE
30 Sep 2008Drawing21 440 REV T1Whole DocFLOOR FINISHES SECOND FLOOR - LINK LOBBY/GALLERY/EDUCATION
30 Sep 2008Drawing0037/300 REV AWhole DocFOUNDATION PLAN, EXISTING BUILDING AND LINK
30 Sep 2008Drawing06 301 REV T0Whole DocFRONT ENTRANCE HALL GROUND FLOOR
30 Sep 2008Drawing06 300 REV T0Whole DocFRONT PORCH STONE THRESHOLD
20 Nov 2008Drawing24 321 T1Whole DocGALLERY DOORS, FIRST AND SECOND FLOORS
20 Nov 2008Drawing24 320 T1Whole DocGALLERY DOORS, SECOND FLOOR
30 Sep 2008Drawing07 460 REV P0Whole DocGRANITE PLINTH DETAIL
23 Oct 2008Drawing0037/605 REV AWhole DocGROUND FLOOR PLAN EXISTING BUILDING
30 Sep 2008Drawing1193/004/AWhole DocLANDSCAPE LEVELS
30 Sep 2008Drawing55 322 T1Whole DocMAIN STAIR FIRST FLOOR LANDING DETAILS
30 Sep 2008Drawing55 319 T1Whole DocMAIN STAIR GROUND FLOOR LANDING DETAILS
30 Sep 2008Drawing55 402 T1Whole DocMAIN STAIR OUTER HANDRAIL DETAILS 1-5
30 Sep 2008Drawing55 403 T1Whole DocMAIN STAIR TYPICAL BALUSTRADE DETAILS 1-4
30 Sep 2008Drawing55 400 T1Whole DocMAIN STAIR TYPICAL THREAD DETAILS 1-4
30 Sep 2008Drawing55 401 T1Whole DocMAIN STAIR TYPICAL THREAD DETAILS 5-8
30 Sep 2008Drawing32-327 REV T0Whole DocMALE WCS AND SHOWER, BASEMENT LEVEL
30 Sep 2008Drawing1193/003/BWhole DocMASTERPLAN GENERAL ARRANGEMENT
30 Sep 2008Drawing1193/302/AWhole DocMEADOW PLANTING PLAN
09 Dec 2008DrawingEPA HOL 06 SK 21 P2Whole DocNORTH EAST REAR PIPE RUN SCOPE OF WORKS
30 Sep 2008Drawing07-220 REV P1Whole DocPROPOSED BASEMENT PLAN
30 Sep 2008Drawing06 SK 02 REV T0Whole DocPROPOSED BASEMENT PLAN REPAIRS
30 Sep 2008Drawing07-246 REV P1Whole DocPROPOSED CROSS SECTION GG
30 Sep 2008Drawing07-247 REV P1Whole DocPROPOSED CROSS SECTION HH
30 Sep 2008Drawing07-249 REV P1Whole DocPROPOSED CROSS SECTION KK
30 Sep 2008Drawing07-251 REV P1Whole DocPROPOSED CROSS SECTION LL
30 Sep 2008Drawing07-252 REV P1Whole DocPROPOSED CROSS SECTION MM
30 Sep 2008Drawing07-253 REV P1Whole DocPROPOSED CROSS SECTION NN
30 Sep 2008Drawing06 SK 26 REV P3Whole DocPROPOSED CROSS SECTIONS 01 & 02
20 Nov 2008Drawing24 355 T1Whole DocPROPOSED DISABLED TOILET DOOR, GROUND FLOOR
20 Nov 2008Drawing24 301 T1Whole DocPROPOSED DOOR SOUTH SIDE, GROUND FLOOR
20 Nov 2008Drawing24 312 T1Whole DocPROPOSED DOOR TO GALLERY, SECOND FLOOR
30 Sep 2008Drawing07-221 REV P1Whole DocPROPOSED EXTENSION BASEMENT PLAN
20 Nov 2008Drawing24 350Whole DocPROPOSED FIRE RATED DOOR, BASEMENT FLOOR
20 Nov 2008Drawing24 351Whole DocPROPOSED FIRE RATED DOOR, BASEMENT FLOOR
20 Nov 2008Drawing24 353 T0Whole DocPROPOSED FIRE RATED DOORS IN EXISTING OPENINGS
30 Sep 2008Drawing07-223 REV P1Whole DocPROPOSED FIRST FLOOR PLAN
30 Sep 2008Drawing06 SK 06 REV T0Whole DocPROPOSED FIRST FLOOR PLAN REPAIRS
20 Nov 2008Drawing24 310 T1Whole DocPROPOSED GALLERY DOOR, FIRST FLOOR
20 Nov 2008Drawing24 314 T1Whole DocPROPOSED GALLERY DOOR, FIRST FLOOR
20 Nov 2008Drawing24 315 T1Whole DocPROPOSED GALLERY DOOR, SECOND FLOOR
30 Sep 2008Drawing06 SK 04 REV T0Whole DocPROPOSED GROUND FLOOR PLAN REPAIRS
30 Sep 2008Drawing07-240 REV P1Whole DocPROPOSED LONG SECTION AA
20 Nov 2008Drawing24 300 T1Whole DocPROPOSED MAIN FRONT DOOR, GROUND FLOOR
30 Sep 2008Drawing07-224 REV P1Whole DocPROPOSED MEZZANINE FLOOR PLAN
30 Sep 2008Drawing06 SK 07 REV T0Whole DocPROPOSED MEZZANINE FLOOR PLAN REPAIRS
30 Sep 2008Drawing07-232 REV P1Whole DocPROPOSED NORTHEAST ELEVATION
09 Dec 2008Drawing07 SK 02Whole DocPROPOSED NORTHEAST ELEVATION COMPARISON
30 Sep 2008Drawing07-233 REV P1Whole DocPROPOSED NORTHWEST ELEVATION
09 Dec 2008Drawing07 SK 03Whole DocPROPOSED NORTHWEST ELEVATION COMPARISON
30 Sep 2008Drawing06 SK 25 REV P3Whole DocPROPOSED PARTIAL BASEMENT PLAN - NW VAULTS
30 Sep 2008Drawing06 SK 29 P1Whole DocPROPOSED PARTIAL GROUND FLOOR PLAN OF NW SIDE
30 Sep 2008Drawing07-226 REV P1Whole DocPROPOSED ROOF PLAN
30 Sep 2008Drawing07-225 REV P1Whole DocPROPOSED SECOND FLOOR PLAN
30 Sep 2008Drawing06 SK 09 REV T0Whole DocPROPOSED SECOND FLOOR PLAN REPAIRS
09 Dec 2008Drawing07 SK 05Whole DocPROPOSED SECTION NN COMPARISON
30 Sep 2008Drawing06 SK 27 P3Whole DocPROPOSED SECTIONS 03, 04 & 05
30 Sep 2008Drawing07-122 REV P0Whole DocPROPOSED SITE PLAN ROOT PROTECTION AREA
30 Sep 2008Drawing07-230 REV P1Whole DocPROPOSED SOUTHEAST ELEVATION
09 Dec 2008Drawing07 SK 04Whole DocPROPOSED SOUTHEAST ELEVATION COMPARISON
30 Sep 2008Drawing07-231 REV P1Whole DocPROPOSED SOUTHWEST ELEVATION
20 Nov 2008Drawing24 360 T1 Whole DocPROPOSED STAIR LANDING DOOR
20 Nov 2008Drawing24 361 T2Whole DocPROPOSED STAIR LANDING DOOR
30 Sep 2008Drawing06 452 REV T0Whole DocPROPOSED WINDOW AND FAN COIL UNIT HOUSING BALLROOM GALLERY WINDOW, FIRST FLOOR
30 Sep 2008Drawing06 453 REV T0Whole DocPROPOSED WINDOW AND FAN COIL UNIT HOUSING BALLROOM GALLERY WINDOW, FIRST FLOOR
30 Sep 2008Drawing06 451 REV T1Whole DocPROPOSED WINDOW AND FAN COIL UNIT HOUSING BALLROOM GALLERY, FIRST FLOOR
30 Sep 2008Drawing07 350 REV P1Whole DocPROPOSED WORKS TO EXISTING ROOF & ROOF LIGHTS, LONG SECTION AA
30 Sep 2008Drawing06-207 REV T0Whole DocREFLECTED CEILING PLAN FIRST FLOOR - CORNICES AND CEILINGS
30 Sep 2008Drawing06-206 REV T0Whole DocREFLECTED CEILING PLAN GROUND FLOOR - CORNICES AND CEILINGS
30 Sep 2008Drawing06-208 REV T0Whole DocREFLECTED CEILING PLAN SECOND FLOOR - CORNICES AND COVINGS
23 Oct 2008Drawing55 300 REV T1Whole DocREFURBISHMENT STAIRHALL: BASEMENT PLAN
23 Oct 2008Drawing55 313 REV T1Whole DocREFURBISHMENT STAIRHALL: SECTION B'B'
23 Oct 2008Drawing55 312 REV T1Whole DocREFURBISHMENT STAIRHALL: SECTION BB
30 Sep 2008Drawing55 317 T1Whole DocREFURBISHMENT: STAIRHALL SECTION AA
20 Nov 2008Drawing24 303 T0Whole DocREPAIRS TO FIRST FLOOR GALLERY EXTERNAL DOOR
30 Sep 2008Drawing1193/005/AWhole DocROAD SURFACE DRAINAGE SETTING OUT
23 Oct 2008Drawing0037/615Whole DocROOF PLAN UPPER, EXISTING BUILDING
30 Sep 2008Drawing06 205 REV T0Whole DocSCHEDULE OF PROPOSED CORNICES/COVINGS EXISTING BUILDING
30 Sep 2008Drawing06 204 REV T2Whole DocSCHEDULE OF PROPOSED SKIRTINGS, EXISTING AND PROPOSED DETAILS AND LOCATIONS
30 Sep 2008Drawing06 SK 21 REV P1Whole DocSCOPE OF WORKS FOR PIPERUNS TO NE ELEVATION
23 Oct 2008Drawing0037/306 REV CWhole DocSECOND FLOOR PLAN
23 Oct 2008Drawing0037/611Whole DocSECOND FLOOR PLAN, EXISTING BUILDING
30 Sep 2008Drawing06 SK 20 REV T0Whole DocSECOND FLOOR WINDOW BLOCKING UP DETAIL WINDOW
30 Sep 2008Drawing06 SK 20 REV T0Whole DocSECOND FLOOR WINDOW, BLOCKING UP DETAIL WINDOW
30 Sep 2008Drawing1193/105/AWhole DocSECTION EE & D1 D1 LAWN RESTORATION AND DRAINAGE
11 Nov 2008Drawing55 352 T1Whole DocSECTIONS BB & GG
30 Sep 2008Drawing32-326 REV T1Whole DocSECTIONS THROUGH PROPOSED FEMALE WC, BASEMENT LEVEL
30 Sep 2008Drawing07-121 REV P0Whole DocSITE PLAN PROPOSED
09 Dec 2008Drawing55 313 T1Whole DocSTAIRHALL REFURBISHMENT - SECTION B'B'
30 Sep 2008Drawing32-322 REV T1Whole DocSUPERSEDED ACCESSIBLE WC, GROUND FLOOR
30 Sep 2008Drawing0037/301 REV AWhole DocSUPERSEDED BASEMENT PLAN
30 Sep 2008Drawing12 202 REV T0Whole DocSUPERSEDED BLOCK WORK, FIRST FLOOR PLAN
30 Sep 2008Drawing12 201 REV T0Whole DocSUPERSEDED BLOCK WORK, GROUND FLOOR PLAN
30 Sep 2008Drawing12 203 REV T0Whole DocSUPERSEDED BLOCK WORK, MEZZANINE FLOOR PLAN
30 Sep 2008Drawing12 204 REV T0Whole DocSUPERSEDED BLOCK WORK, SECOND FLOOR PLAN
30 Sep 2008Drawing20 202 REV T1Whole DocSUPERSEDED DRYLINING, FIRST FLOOR PLAN
30 Sep 2008Drawing20 201 REV T1Whole DocSUPERSEDED DRYLINING, GROUND FLOOR PLAN
30 Sep 2008Drawing20 203 REV T1Whole DocSUPERSEDED DRYLINING, MEZZANINE FLOOR PLAN
30 Sep 2008Drawing20 204 REV T1Whole DocSUPERSEDED DRYLINING, SECOND FLOOR PLAN
30 Sep 2008Drawing06 SK 16 REV T0Whole DocSUPERSEDED EXISTING NORTHEAST ELEVATION STONE REPAIRS
30 Sep 2008Drawing06 SK 17 REV T0Whole DocSUPERSEDED EXISTING NORTHWEST ELEVATION STONE REPAIRS
30 Sep 2008Drawing03-208 REV P5Whole DocSUPERSEDED EXISTING SECTION JJ
30 Sep 2008Drawing06 SK 18 REV T0Whole DocSUPERSEDED EXISTING SOUTHEAST ELEVATION STONE REPAIRS
30 Sep 2008Drawing06 SK 19 REV T0Whole DocSUPERSEDED EXISTING SOUTHWEST ELEVATION STONE REPAIRS
30 Sep 2008Drawing32-321 REV T2Whole DocSUPERSEDED FEMALE WCS
30 Sep 2008Drawing21 223 REV T0Whole DocSUPERSEDED FLOOR FINISHES FIRST FLOOR PLAN
30 Sep 2008Drawing21 222 REV T0Whole DocSUPERSEDED FLOOR FINISHES GROUND FLOOR PLAN
30 Sep 2008Drawing21 225 REV T0Whole DocSUPERSEDED FLOOR FINISHES SECOND FLOOR PLAN
30 Sep 2008Drawing0037/302 REV AWhole DocSUPERSEDED FOUNDATION PLAN EXTENSION
30 Sep 2008Drawing06 302 REV T0Whole DocSUPERSEDED FRONT ENTRANCE HALL GROUND FLOOR
30 Sep 2008Drawing0037/303 REV BWhole DocSUPERSEDED GROUND FLOOR PLAN
30 Sep 2008Drawing06 324 REV T0Whole DocSUPERSEDED GROUND FLOOR SHOP G08, CIRCULAR WINDOW W1
30 Sep 2008Drawing06 325 REV T0Whole DocSUPERSEDED GROUND FLOOR SHOP G08, CIRCULAR WINDOW W1
30 Sep 2008Drawing06 320 REV T0Whole DocSUPERSEDED GROUND FLOOR SHOP G08, PLAN AND REFLECTED CEILING PLAN
30 Sep 2008Drawing06 321 REV T0Whole DocSUPERSEDED GROUND FLOOR SHOP G08, SECTIONS CC & JJ
30 Sep 2008Drawing06 322 REV T0Whole DocSUPERSEDED GROUND FLOOR SHOP G08, SECTIONS DD & KK
30 Sep 2008Drawing32-320 REV T2Whole DocSUPERSEDED MALE WCS
30 Sep 2008Drawing0037/305 BWhole DocSUPERSEDED MEZZANINE PLAN
30 Sep 2008Drawing04-220 REV T0Whole DocSUPERSEDED PROPOSED BASEMENT REFLECTED CEILING PLAN
30 Sep 2008Drawing06 350 REV T0Whole DocSUPERSEDED PROPOSED EDUCATION ROOM AND OFFICES SECTIONS 1 & 2
30 Sep 2008Drawing06 351 REV T0Whole DocSUPERSEDED PROPOSED EDUCATION ROOM AND OFFICES SECTIONS 3 & 4
30 Sep 2008Drawing06 340 REV T0Whole DocSUPERSEDED PROPOSED EDUCATION ROOM/LECTURE ROOM - GROUND FLOOR LEVEL
30 Sep 2008Drawing04-223 REV T0Whole DocSUPERSEDED PROPOSED FIRST FLOOR REFLECTED CEILING PLAN
30 Sep 2008Drawing07-222 REV P1Whole DocSUPERSEDED PROPOSED GROUND FLOOR PLAN
30 Sep 2008Drawing04-222 REV T0Whole DocSUPERSEDED PROPOSED GROUND FLOOR REFLECTED CEILING PLAN
30 Sep 2008Drawing06 341 REV T0Whole DocSUPERSEDED PROPOSED LECTURE ROOM AND OFFICES, REFLECTED CEILING PLAN
30 Sep 2008Drawing04-224 REV T0Whole DocSUPERSEDED PROPOSED MEZZANINE REFLECTED CEILING PLAN
30 Sep 2008Drawing06 200 REV T2Whole DocSUPERSEDED PROPOSED SCOPE OF SKIRTINGS BASEMENT PLAN
30 Sep 2008Drawing06 202 REV T2Whole DocSUPERSEDED PROPOSED SCOPE OF SKIRTINGS FIRST FLOOR PLAN
30 Sep 2008Drawing06 201 REV T2Whole DocSUPERSEDED PROPOSED SCOPE OF SKIRTINGS GROUND FLOOR PLAN
30 Sep 2008Drawing06 203 REV T2Whole DocSUPERSEDED PROPOSED SCOPE OF SKIRTINGS SECOND FLOOR PLAN
30 Sep 2008Drawing04-225 REV T0Whole DocSUPERSEDED PROPOSED SECOND FLOOR REFLECTED CEILING PLAN
30 Sep 2008Drawing55 302 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL FIRST FLOOR PLAN
30 Sep 2008Drawing55 301 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL GROUND FLOOR PLAN
30 Sep 2008Drawing55 303 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL SECOND FLOOR PLAN
30 Sep 2008Drawing55 311 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL SECTION A'A'
30 Sep 2008Drawing55 310 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL SECTION AA
30 Sep 2008Drawing55 314 T1Whole DocSUPERSEDED REFURBISHMENT: STAIRHALL SECTION CC
30 Sep 2008Drawing0037/307 BWhole DocSUPERSEDED ROOF PLAN LOWER
30 Sep 2008Drawing0037/308 BWhole DocSUPERSEDED ROOF PLAN UPPER
30 Sep 2008Drawing32-325 REV T1Whole DocSUPERSEDED SECTIONS THROUGH PROPOSED MALE WC, BASEMENT LEVEL
30 Sep 2008Drawing1193/103/AWhole DocSURFACES AND EDGES DETAILS SECTIONS
30 Sep 2008Drawing1193/102/AWhole DocSURFACES AND EDGES DETAILS SECTIONS
30 Sep 2008Drawing00-210 REV P0Whole DocTEAHOUSE EXISTING LAYOUT
30 Sep 2008Drawing00-311 REV P0Whole DocTEAHOUSE PROPOSED LAYOUT
20 Nov 2008Drawing24 371 T0Whole DocTYPICAL DETAILS TIMBER HOLD OPEN DOOR FD60S
30 Sep 2008Drawing1193/104/AWhole DocWALL OPENING
20 Nov 2008Drawing24 322Whole DocWORKS TO D103
20 Nov 2008Drawing24 323Whole DocWORKS TO D107
20 Nov 2008Drawing24 324Whole DocWORKS TO D202
30 Sep 2008OS ExtractJ017480/1AWhole DocSITE LOCATION PLAN
24 Mar 2009Correspondence Whole DocBRIAN PECKHAM
17 Oct 2008Correspondence Whole DocCASE OFFICER
09 Feb 2009Correspondence Whole DocCASE OFFICER
21 Jan 2009Correspondence Whole DocCHRISTINE HUMPREYS EMAIL
09 Dec 2008Correspondence Whole DocCORRESPONDENCE 09 DEC
11 Nov 2008Correspondence Whole DocCORRESPONDENCE 11 NOV
20 Nov 2008Correspondence Whole DocCORRESPONDENCE 20 NOV
23 Oct 2008Correspondence Whole DocCORRESPONDENCE 23/10/08
30 Sep 2008Correspondence Whole DocCOVERING LETTER & DRAWING LIST
09 Dec 2008Correspondence Whole DocE MAIL RELIST OF DRAWINGS
11 Dec 2008Correspondence Whole DocEMAIL RE SVP JPG
12 Dec 2008Correspondence Whole DocERIC PARRY ARCHITECTS
09 Apr 2009Correspondence Whole DocGEOFF WEBBER
12 Feb 2009Correspondence Whole DocGOSW DECISION LETTER
15 Dec 2008Correspondence Whole DocLETTER RE STONE WORK CLEANING
09 Dec 2008Correspondence Whole DocLIST OF DRAWINGS
14 Jan 2009Correspondence Whole DocREFERAL TO SSE LETTER
11 Dec 2008Correspondence Whole DocREVISED PLANS COVERING LETTER
30 Sep 2008Correspondence Whole DocWA HERITAGE CORRESPONDENCE
27 Mar 2009Decision Whole DocCOMMENCEMENT OF WORKS CONDITIONS
05 Mar 2009Decision Whole DocDECISION NOTICE
07 Oct 2008Other Whole DocDRAWING LIST
15 Dec 2008Other Whole DocISSUE LIST
10 Dec 2008Report Whole DocCOMMITTEE REPORT
14 Jan 2009Report Whole DocSCHEDULE OF PROPOSED CONDITIONS
17 Dec 2008Report Whole DocUPDATE REPORT
30 Sep 2008BackGround Papers Whole DocACCESSORIES/SUNDRY ITEMS FOR BRICK/BLOCK/STONE WALLING SPECIFICATION
30 Sep 2008BackGround Papers Whole DocARBORICULTURAL IMPACT ASSESSMENT - JULY 2007
30 Sep 2008BackGround Papers Whole DocARBORICULTURAL IMPACT ASSESSMENT - MAY 2008
30 Sep 2008BackGround Papers Whole DocARCHAEOLOGICAL ASSESSMENT FEBRUARY 2004
30 Sep 2008BackGround Papers Whole DocARCHAEOLOGICAL EVALUATION REPORT APRIL 2006
30 Sep 2008BackGround Papers Whole DocARCHAEOLOGICAL EXCAVATION REPORT AUGUST 2008
30 Sep 2008BackGround Papers Whole DocARCHITECTURAL DESIGN STATEMENT - SEP 2007
30 Sep 2008BackGround Papers Whole DocARCHITECTURAL DESIGN STATEMENT - SEPTEMBER 2008
30 Sep 2008BackGround Papers Whole DocASSESSMENT OF PART OF THE VAULTS
30 Sep 2008BackGround Papers Whole DocBRICK/BLOCK WALLING SPECIFICATION
20 Nov 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
20 Nov 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
20 Nov 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
09 Dec 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
09 Dec 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
09 Dec 2008BackGround Papers Whole DocDOCUMENT ISSUE SHEET
20 Nov 2008BackGround Papers Whole DocDOOR SCHEDULE
30 Sep 2008BackGround Papers Whole DocDOORS/SHUTTERS/HATCHES SPECIFICATION
30 Sep 2008BackGround Papers Whole DocDOORS/WINDOWS/IRONMONGERY SPECIFICATION
12 Dec 2008BackGround Papers Whole DocDRAWING ISSUE SHEET
23 Oct 2008BackGround Papers Whole DocDRAWING SCHEDULE 23/10/08
30 Sep 2008BackGround Papers Whole DocEXISTING BUILDING/PLASTER/RENDER SPECIFICATION
30 Sep 2008BackGround Papers Whole DocFIRE SAFETY STRATEGY REPORT
30 Sep 2008BackGround Papers Whole DocFIXINGS AND ADHESIVES SPECIFICATION
30 Sep 2008BackGround Papers Whole DocHERITAGE AND VISUAL ASSESSMENT REPORT
30 Sep 2008BackGround Papers Whole DocHISTORIC FABRIC IMPACT ASSESSMENT
30 Sep 2008BackGround Papers Whole DocHOLBURNE MUSEUM AND SYDNEY GARDENS
30 Sep 2008BackGround Papers Whole DocHOLBURNE MUSEUM AND SYDNEY GARDENS COVERING UPDATE
30 Sep 2008BackGround Papers Whole DocINTERNAL GLAZING SPECIFICATION
30 Sep 2008BackGround Papers Whole DocINVESTIGATION FOR HISTORIC BUILDING RECORDING
20 Nov 2008BackGround Papers Whole DocIRONMONGERY SCHEDULE
30 Sep 2008BackGround Papers Whole DocJUSTIFICATION OF STAIR REPOSITIONING
20 Nov 2008BackGround Papers Whole DocL20 DOORS SPECIFICATION
30 Sep 2008BackGround Papers Whole DocLANDSCAPE DESIGN STATEMENT
30 Sep 2008BackGround Papers Whole DocM60 PAINTING AND CLEAR FINISHING SPECIFICATIONS
24 Mar 2009BackGround Papers Whole DocMETHOD STATEMENT
20 Nov 2008BackGround Papers Whole DocP21 DOORS
30 Sep 2008BackGround Papers Whole DocPLANNING, DESIGN AND ACCESS STATEMENT
30 Sep 2008BackGround Papers Whole DocPLANT SCHEDULE
30 Sep 2008BackGround Papers Whole DocPLASTERBOARD DRY LININGS/PARTITIONS/CEILINGS SPECIFICATION
30 Sep 2008BackGround Papers Whole DocREPORT ON AN ARBORICULTURAL ASSESSMENT
30 Sep 2008BackGround Papers Whole DocRUBBER FLOORING SPECIFICATION
11 Dec 2008BackGround Papers Whole DocSCHEDULE OF DRAWINGS
17 Oct 2008BackGround Papers Whole DocSITE NOTICE
30 Sep 2008BackGround Papers Whole DocSTONE FLOOR FINISHES SPECIFICATION
30 Sep 2008BackGround Papers Whole DocTEMPORARY GATE REMOVAL
12 Dec 2008BackGround Papers Whole DocTEMPORARY GATE REMOVAL
30 Sep 2008BackGround Papers Whole DocTRANSPORT ASSESSMENT
30 Sep 2008BackGround Papers Whole DocTRAVEL PLAN
30 Sep 2008BackGround Papers Whole DocUNFRAMED ISOLATED TRIMS/SKIRTINGS/SUNDRY ITEMS SPECIFICATION
09 Oct 2008BackGround Papers Whole DocWEEKLY LIST ADVERT
30 Sep 2008BackGround Papers Whole DocWOOD FLOORING SPECIFICATION
11 Dec 2008Photo Whole Doc02. HOL EXISTING PIPES AND SOIL PHOTO
30 Sep 2008Photo Whole DocEXISTING SITE PHOTOGRAPHS
23 Oct 2008Revised DrawingEPA/HOL 32 322 REV T2Whole DocACCESSIBLE WC, GROUND FLOOR
23 Oct 2008Revised DrawingEPA/HOL 32 325 REV T2Whole DocBASEMENT LEVEL SECTION THROUGH PROPOSED MALE WC
23 Oct 2008Revised Drawing0037/301 REV CWhole DocBASEMENT PLAN
23 Oct 2008Revised DrawingEPA HOL 12 202 REV T1Whole DocBLOCKWORK FIRST FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 12 201 REV T1Whole DocBLOCKWORK GROUND FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 12 203 REV T1Whole DocBLOCKWORK MEZZANINE FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 12 204 REV T1Whole DocBLOCKWORK SECOND FLOOR PLAN
20 Nov 2008Revised Drawing24 330 T2Whole DocDOOR FROM STAIRHALL TO LOBBY, SECOND FLOOR
20 Nov 2008Revised Drawing24 325 T2Whole DocDOORS TO CURATOR'S OFFICE, SECOND FLOOR
09 Dec 2008Revised Drawing24 321 T2Whole DocDOORS, GALLERY, FIRST & SECOND FLOORS
23 Oct 2008Revised DrawingEPA HOL 20 200 REV T2Whole DocDRYLINING BASEMENT PLAN
23 Oct 2008Revised DrawingEPA HOL 20 202 REV T2Whole DocDRYLINING FIRST FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 20 201 REV T2Whole DocDRYLINING GROUND FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 20 203 REV T2Whole DocDRYLINING MEZZANINE FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 20 204 REV T2Whole DocDRYLINING SECOND FLOOR PLAN
20 Nov 2008Revised Drawing24 326 T1Whole DocEXISTING CURATOR'S DOOR, FIRST FLOOR
23 Oct 2008Revised Drawing06 SK 16 REV T2Whole DocEXISTING NORTHEAST ELEVATION STONE REPAIRS
23 Oct 2008Revised Drawing06 SK 17 REV T2Whole DocEXISTING NORTHWEST ELEVATION STONE REPAIRS
11 Nov 2008Revised Drawing03-208 P6Whole DocEXISTING SECTION JJ
23 Oct 2008Revised Drawing06 SK 18 REV T2Whole DocEXISTING SOUTHEAST ELEVATION STONE REPAIRS
23 Oct 2008Revised Drawing06 SK 19 REV T2Whole DocEXISTING SOUTHWEST ELEVATION STONE REPAIRS
20 Nov 2008Revised Drawing24 331 T2Whole DocEXISTING STAIRWELL TO LOBBY DOOR, SECOND FLOOR
23 Oct 2008Revised DrawingEPA/HOL 32-321 REV T3Whole DocFEMALE WC
09 Dec 2008Revised Drawing06 454 T2Whole DocFIRST FLOOR BALLROOM GALLERY WINDOW PROPOSED SECONDARY GLAZING DETAILS
23 Oct 2008Revised DrawingEPA HOL 21 223 REV T1Whole DocFLOOR FINISHES FIRST FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 21 222 REV T1Whole DocFLOOR FINISHES GROUND FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 21 224 REV T1Whole DocFLOOR FINISHES MEZZANINE FLOOR PLAN
23 Oct 2008Revised DrawingEPA HOL 21 225 REV T1Whole DocFLOOR FINISHES SECOND FLOOR PLAN
23 Oct 2008Revised Drawing0037/302 REV CWhole DocFOUNDATION PLAN EXTENSION
23 Oct 2008Revised Drawing06 302 REV T1Whole DocFRONT ENTRANCE HALL GROUND FLOOR
23 Oct 2008Revised Drawing0037/303 REV DWhole DocGROUND FLOOR PLAN
23 Oct 2008Revised Drawing06 324 REV T1Whole DocGROUND FLOOR SHOP G08 CIRCULAR WINDOW W1
23 Oct 2008Revised Drawing06 325 REV T1Whole DocGROUND FLOOR SHOP G08 CIRCULAR WINDOW W1
23 Oct 2008Revised Drawing06 320 REV T1Whole DocGROUND FLOOR SHOP G08 PLAN AND REFLECTED CEILING PLAN
23 Oct 2008Revised Drawing06 321 REV T1Whole DocGROUND FLOOR SHOP G08 SECTIONS CC & JJ
23 Oct 2008Revised Drawing06 322 REV T1Whole DocGROUND FLOOR SHOP G08 SECTIONS DD & KK
23 Oct 2008Revised DrawingEPA/HOL 32-320 REV T3Whole DocMALE WC
23 Oct 2008Revised Drawing0037/305 REV CWhole DocMEZZANINE PLAN
09 Dec 2008Revised Drawing07-220 P2Whole DocPROPOSED BASEMENT PLAN
23 Oct 2008Revised Drawing04-220 REV T1Whole DocPROPOSED BASEMENT RELECTED CEILING PLAN
20 Nov 2008Revised Drawing24 327 T2Whole DocPROPOSED CURATOR'S DOOR, FIRST FLOOR
23 Oct 2008Revised Drawing06 350 REV T1Whole DocPROPOSED EDUCATION ROOM AND OFFICES SECTIONS 1 AND 2
23 Oct 2008Revised Drawing06 351 REV T1Whole DocPROPOSED EDUCATION ROOM AND OFFICES SECTIONS 3 AND 4
23 Oct 2008Revised Drawing06 340 REV T1Whole DocPROPOSED EDUCATION ROOM/LECTURE ROOM GROUND FLOOR LEVEL
23 Oct 2008Revised Drawing04-223 REV T1Whole DocPROPOSED FIRST FLOOR REFLECTED CEILING PLAN
11 Nov 2008Revised Drawing07-222 P2Whole DocPROPOSED GROUND FLOOR PLAN
23 Oct 2008Revised Drawing04-222 REV T1Whole DocPROPOSED GROUND FLOOR REFLECTED CEILING PLAN
23 Oct 2008Revised Drawing06 341 REV T1Whole DocPROPOSED LECTURE ROOM AND OFFICES REFLECTED CEILING PLAN
09 Dec 2008Revised Drawing07-240 P2Whole DocPROPOSED LONG SECTION AA
23 Oct 2008Revised Drawing04-224 REV T1Whole DocPROPOSED MEZZANINE REFLECTED CEILING PLAN
09 Dec 2008Revised Drawing07-232 P2Whole DocPROPOSED NORTHEAST ELEVATION
09 Dec 2008Revised Drawing07 SK 01Whole DocPROPOSED ROOF PLAN - COMPARISON
23 Oct 2008Revised Drawing06 200 REV T3Whole DocPROPOSED SCOPE OF SKIRTINGS BASEMENT PLAN
23 Oct 2008Revised Drawing06 202 REV T3Whole DocPROPOSED SCOPE OF SKIRTINGS FIRST FLOOR PLAN
23 Oct 2008Revised Drawing06 201 REV T3Whole DocPROPOSED SCOPE OF SKIRTINGS GROUND FLOOR PLAN
23 Oct 2008Revised Drawing06 203 REV T3Whole DocPROPOSED SCOPE OF SKIRTINGS SECOND FLOOR PLAN
23 Oct 2008Revised Drawing04-225 REV T1Whole DocPROPOSED SECOND FLOOR REFLECTED CEILING PLAN
09 Dec 2008Revised Drawing07-246 P2Whole DocPROPOSED SECTION GG
09 Dec 2008Revised Drawing07-247 P2Whole DocPROPOSED SECTION HH
09 Dec 2008Revised Drawing07-249 P2Whole DocPROPOSED SECTION KK
20 Nov 2008Revised Drawing24 332 T2Whole DocPROPOSED STAIRWELL TO LOBBY DOOR, SECOND FLOOR
09 Dec 2008Revised Drawing06 451 T2Whole DocPROPOSED WINDOW AND FAN HOUSING, BALLROOM GALLERY
23 Oct 2008Revised DrawingEPA/HOL 55 302 REV T2Whole DocREFURBISHMENT STAIRHALL: FIRST FLOOR PLAN
23 Oct 2008Revised DrawingEPA/HOL 55 301 REV T2Whole DocREFURBISHMENT STAIRHALL: GROUND FLOOR PLAN
23 Oct 2008Revised DrawingEPA/HOL 55 303 REV T2Whole DocREFURBISHMENT STAIRHALL: SECOND FLOOR PLAN
23 Oct 2008Revised DrawingEPA/HOL 55 311 REV T2Whole DocREFURBISHMENT STAIRHALL: SECTION A'A'
23 Oct 2008Revised DrawingEPA/HOL 55 310 REV T2Whole DocREFURBISHMENT STAIRHALL: SECTION AA
23 Oct 2008Revised DrawingEPA/HOL 55 317 REV T2Whole DocREFURBISHMENT STAIRHALL: SECTION AA
23 Oct 2008Revised DrawingEPA/HOL 55 314 REV T2Whole DocREFURBISHMENT STAIRHALL: SECTION CC
23 Oct 2008Revised Drawing0037/307 REV CWhole DocROOF PLAN LOWER
23 Oct 2008Revised Drawing0037/308 REV CWhole DocROOF PLAN UPPER
11 Dec 2008Revised Drawing06 SK21 P2Whole DocSCOPE OF WORKS FOR PIPERUNS TO NE ELEVATION
21 Jan 2009Revised DrawingEPA HOL 07-121 P1Whole DocSITE PLAN
09 Dec 2008Revised Drawing55 314 T2Whole DocSTAIRHALL REFURBISHMENT - SECTION CC
04 Dec 2008Consultation Response Whole DocARCHEOLOGICAL OFFICER
05 Dec 2008Consultation Response Whole DocENGLISH HERITAGE
31 Oct 2008Consultation Response Whole DocGARDEN HISTORY SOCIETY
01 Dec 2008Consultation Response Whole DocTHE GARDEN HISTORY SOCIETY