Please note - Prior to decision or at appeal stage a full list of public comments for this application are available on the comments tab on the main application details page.

Associated Documents

Drawings can be large files. The quality of the image depends on the quality of the original submission.

Date publishedDocument TypeDrawing NumberViewDescription
18 Nov 2016Application Form Whole DocAPPLICATION FORM
18 Nov 2016Drawing1604-S03Whole DocBASEMENT PLAN AS EXISTING
18 Nov 2016Drawing1604-L03Whole DocBASEMENT PLAN AS PROPOSED
18 Nov 2016Drawing1604-D03Whole DocBASEMENT PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-L16Whole DocCONTEXTUAL ELEVATIONS
18 Nov 2016Drawing1604-S15Whole DocELEVATIONS AS EXISTING
18 Nov 2016Drawing1604-S14Whole DocELEVATIONS AS EXISTING
18 Nov 2016Drawing1604-S13Whole DocELEVATIONS AS EXISTING
18 Nov 2016Drawing1604-L14Whole DocELEVATIONS AS PROPOSED
18 Nov 2016Drawing1604-L13Whole DocELEVATIONS AS PROPOSED
18 Nov 2016Drawing1604-L15Whole DocELEVATIONS AS PROPOSED
18 Nov 2016Drawing1604-A01Whole DocELEVATIONS DETAIL
18 Nov 2016Drawing1604-S05Whole DocFIRST FLOOR PLAN AS EXISTING
18 Nov 2016Drawing1604-L05Whole DocFIRST FLOOR PLAN AS PROPOSED
18 Nov 2016Drawing1604-L08Whole DocFOURTH FLOOR PLAN AS PROPOSED
18 Nov 2016Drawing1604-S04Whole DocGROUND FLOOR PLAN AS EXISTING
18 Nov 2016Drawing1604-L04Whole DocGROUND FLOOR PLAN AS PROPOSED
18 Nov 2016Drawing1604-D04Whole DocGROUND FLOOR PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-S09Whole DocROOF PLAN AS EXISTING
18 Nov 2016Drawing1604-S02Whole DocROOF PLAN AS EXISTING
18 Nov 2016Drawing1604-L09Whole DocROOF PLAN AS PROPOSED
18 Nov 2016Drawing1604-L02Whole DocROOF PLAN AS PROPOSED
18 Nov 2016Drawing1604-D09Whole DocROOF PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-S06Whole DocSECOND FLOOR PLAN AS EXISTING
18 Nov 2016Drawing1604-L06Whole DocSECOND FLOOR PLAN AS PROPOSED
18 Nov 2016Drawing1604-S10Whole DocSECTION A-A AS EXISTING
18 Nov 2016Drawing1604-L10Whole DocSECTION A-A AS PROPOSED
18 Nov 2016Drawing1604-S11Whole DocSECTION B-B AS EXISTING
18 Nov 2016Drawing1604-L11Whole DocSECTION B-B AS PROPOSED
18 Nov 2016Drawing1604-S12Whole DocSECTION C-C AS EXISTING
18 Nov 2016Drawing1604-L12Whole DocSECTION C-C AS PROPOSED
18 Nov 2016Drawing1604-D05Whole DocSUPERSEDED - FIRST FLOOR PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-D06Whole DocSUPERSEDED - SECOND FLOOR PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-D07Whole DocSUPERSEDED - THIRD FLOOR PLAN DEMOLITIONS AND REPAIRS
18 Nov 2016Drawing1604-S07Whole DocTHIRD FLOOR PLAN AS EXISTING
18 Nov 2016Drawing1604-L07Whole DocTHIRD FLOOR PLAN AS PROPOSED
18 Nov 2016OS Extract1604-S01Whole DocSITE LOCATION PLAN
29 Nov 2016Correspondence Whole DocAGENT
21 Dec 2016Correspondence Whole DocWITHDRAWAL REQUEST
21 Dec 2016Decision Whole DocWITHDRAWAL LETTER
18 Nov 2016BackGround Papers Whole DocANNOTATED ROOFSCAPE PHOTO REPORT
18 Nov 2016BackGround Papers Whole DocANNOTATED SITE PHOTO REPORT
18 Nov 2016BackGround Papers Whole DocHERITAGE STATEMENT
29 Nov 2016BackGround Papers Whole DocPHOTO REPORT - OPENING UP
29 Nov 2016BackGround Papers Whole DocPHOTO REPORT - PRECEDENT & CONTEXT STUDY
18 Nov 2016BackGround Papers Whole DocPLANING DESIGN AND ACCESS STATEMENT
18 Nov 2016BackGround Papers Whole DocVERIFIABLE VISUAL MONTAGES
29 Nov 2016Revised Drawing1604-D05 AWhole DocFIRST FLOOR PLAN DEMOLITIONS & REPAIRS
29 Nov 2016Revised Drawing1604-D06 AWhole DocSECOND FLOOR PLAN DEMOLITIONS & REPAIRS
29 Nov 2016Revised Drawing1604-D07 AWhole DocTHIRD FLOOR PLAN DEMOLITIONS & REPAIRS
08 Dec 2016Consultation Response Whole DocHIGHWAYS