Please note - Prior to decision or at appeal stage a full list of public comments for this application are available on the comments tab on the main application details page.

Associated Documents

Drawings can be large files. The quality of the image depends on the quality of the original submission.

Date publishedDocument TypeDrawing NumberViewDescription
10 Feb 2017Application Form Whole DocAPPLICATION FORM
27 Apr 2017Drawing1705_L15Whole Doc11 UNION PASSAGE EAST ELEVATION AS PROPOSED
10 Feb 2017Drawing1604-S03Whole DocBASEMENT PLAN AS EXISTING
10 Feb 2017Drawing1604-S14Whole DocELEVATIONS AS EXISTING
10 Feb 2017Drawing1604-S15Whole DocELEVATIONS AS EXISTING
10 Feb 2017Drawing1604-S13Whole DocELEVATIONS AS EXISTING
10 Feb 2017Drawing1604-S05Whole DocFIRST FLOOR PLAN AS EXISTING
10 Feb 2017Drawing1604-L05Whole DocFIRST FLOOR PLAN AS PROPOSED
10 Feb 2017Drawing1604-D05AWhole DocFIRST FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-L08Whole DocFOURTH FLOOR PLAN AS PROPOSED
10 Feb 2017Drawing1604-S04Whole DocGROUND FLOOR PLAN AS EXISTING
27 Apr 2017Drawing Whole DocPROPOSED CGI VIEW 1
27 Apr 2017Drawing Whole DocPROPOSED CGI VIEW 2
10 Feb 2017Drawing1604-S09Whole DocROOF PLAN AS EXISTING
10 Feb 2017Drawing1604-S02Whole DocROOF PLAN AS EXISTING
10 Feb 2017Drawing1604-L02Whole DocROOF PLAN AS PROPOSED
10 Feb 2017Drawing1604-L09Whole DocROOF PLAN AS PROPOSED
10 Feb 2017Drawing1604-D09Whole DocROOF PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-S06Whole DocSECOND FLOOR PLAN AS EXISTING
10 Feb 2017Drawing1604-L06Whole DocSECOND FLOOR PLAN AS PROPOSED
10 Feb 2017Drawing1604-D06AWhole DocSECOND FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-S10Whole DocSECTION A-A AS EXISTING
10 Feb 2017Drawing1604-L10Whole DocSECTION A-A AS PROPOSED
10 Feb 2017Drawing1604-S11Whole DocSECTION B-B AS EXISTING
10 Feb 2017Drawing1604-S13Whole DocSECTION C-C AS EXISTING
10 Feb 2017Drawing1604-L17Whole DocSECTION D-D AS PROPOSED
10 Feb 2017Drawing1604-L18Whole DocSECTION E-E AND NORTH ELEVATION AS PROPOSED
10 Feb 2017Drawing1604-A02Whole DocSHOPFRONT ELEVATIONS
10 Feb 2017Drawing1604-L14Whole DocSOUTH ELEVATION AS PROPOSED
27 Apr 2017Drawing1604-A03 Whole DocSTAIR DETAILS
10 Feb 2017Drawing1604-L03Whole DocSUPERSEDED BASEMENT PLAN AS PROPOSED
10 Feb 2017Drawing1604-D03Whole DocSUPERSEDED BASEMENT PLAN DEMOLITIONS AND REPAIRS
10 Feb 2017Drawing1604-L15Whole DocSUPERSEDED EAST ELEVTION AS PROPOSED
10 Feb 2017Drawing1604-L13Whole DocSUPERSEDED ELEVATIONS AS PROPOSED
10 Feb 2017Drawing1604-D05Whole DocSUPERSEDED FIRST FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-L04Whole DocSUPERSEDED GROUND FLOOR PLAN AS PROPOSED
10 Feb 2017Drawing1604-D04Whole DocSUPERSEDED GROUND FLOOR PLAN DEMOLITIONS AND REPAIRS
10 Feb 2017Drawing1604-D06Whole DocSUPERSEDED SECOND FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-L11Whole DocSUPERSEDED SECTION B-B AS PROPOSED
10 Feb 2017Drawing1604-D07Whole DocSUPERSEDED THIRD FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017Drawing1604-S07Whole DocTHIRD FLOOR PLAN AS EXISTING
10 Feb 2017Drawing1604-L07Whole DocTHIRD FLOOR PLAN AS PROPOSED
10 Feb 2017Drawing1604-D07AWhole DocTHIRD FLOOR PLAN DEMOLITION AND REPAIRS
10 Feb 2017OS Extract1604-S01Whole DocSITE LOCATION PLAN
27 Apr 2017Correspondence Whole DocREVISED PLANS COVERING LETTER
24 Apr 2017Report Whole DocCOMMITTEE AGENDA
10 Feb 2017BackGround Papers Whole DocCOMPUTER GENERATED IMAGES
10 Feb 2017BackGround Papers Whole DocHERITAGE STATEMENT
27 Apr 2017BackGround Papers Whole DocHERITAGE STATEMENT APPENDUM
10 Feb 2017BackGround Papers Whole DocPHOTO REPORT
10 Feb 2017BackGround Papers Whole DocPHOTO REPORT - ADDENDUM 1.0
10 Feb 2017BackGround Papers Whole DocPHOTO REPORT - OPENING UP
10 Feb 2017BackGround Papers Whole DocPLANNING, DESIGN AND ACCESS STATEMENT
10 Feb 2017BackGround Papers Whole DocVERIFIABLE VISUAL MONTAGES
27 Apr 2017Photo Whole DocPROPOSED STREET VIEW 1
27 Apr 2017Photo Whole DocPROPOSED STREET VIEW 2
19 Feb 2017Objection Comment Whole DocBATH HERITAGE WATCHDOG
27 Apr 2017Revised Drawing1604-L03 AWhole DocBASEMENT PLAN AS PROPOSED
27 Apr 2017Revised Drawing1604-D03 AWhole DocBASEMENT PLAN DEMOLITION AND REPAIRS
27 Apr 2017Revised Drawing1604-L15 AWhole DocEAST ELEVATION AS PROPOSED
27 Apr 2017Revised Drawing1604-L04 AWhole DocGROUND FLOOR PLAN AS PROPOSED
27 Apr 2017Revised Drawing1604-D04 AWhole DocGROUND FLOOR PLAN DEMOLITIONS AND REPAIRS
27 Apr 2017Revised Drawing1604-A01 AWhole DocREAR ELEVATION DETAIL
27 Apr 2017Revised Drawing1604-L11 AWhole DocSECTION B-B AS PROPOSED
29 Mar 2017Revised Drawing1604-A01Whole DocSUPERSEDED REAR ENTRANCE
27 Apr 2017Revised Drawing1604-L13 BWhole DocWEST ELEVATION AS PROPOSED
16 Feb 2017Consultation Response Whole DocCLLR PETER TURNER - REQUEST FOR APPLICATION TO GO TO COMMITTEE
20 Mar 2017Consultation Response Whole DocCONSERVATION